Lübeck/Hamburg/Rostock: prolonged heat to restore full beaches and streets

The status lights on the website strandticker.de showed up for lunch for some of the beaches of the Bay of lübeck already Red. Among other things, in Niendorf,

Lübeck/Hamburg/Rostock: prolonged heat to restore full beaches and streets

The status lights on the website strandticker.de showed up for lunch for some of the beaches of the Bay of lübeck already Red. Among other things, in Niendorf, Scharbeutz, Rettin and the Timmendorfer beach, the beach sections were full. Bathing the German life saving society (DLRG) was issued on Saturday after the warnings from Thursday and Friday. The situation must, however, be further observed, said a police spokesman. On the highways it came to some traffic jams towards the coast. Focus on Hamburg was the first. On the A7, it was backed up between Hamburg-Hausbruch and Stellingen to 10 kilometers. Between Schnelsen and the Elbtunnel direction South, and 13 km. On the A1 it came between the batch box and the cross-Bargteheide, due to a construction site to a long traffic jam.

In Mecklenburg-Vorpommern were at high summer temperatures also again a lot of people on the way to the Baltic sea. By noon it was on the beaches of the North-West of Mecklenburg to Graal-Müritz, a capacity utilization of around 70 percent of the seats, like a police spokesman said.

The highway police Grimmen reported on the A20 towards Lübeck to the part about an hour time delay. The On and departure traffic around Rügen flow, however, so far, without a larger volume of traffic, said a spokesman.

dpa

Date Of Update: 15 August 2020, 11:26
NEXT NEWS